Projects organize tasks and related activity.
What you can do#
- List projects in a dense grid or a table grouped by status
- Filter by scopes (All / In progress / Overdue / Completed / Archived) and search by name — query params feed the server listing; the title counter reflects the filtered total
- Create, pin, and mark default
- Open the detail: short rail (meta, progress, member avatars, recent activity) + board on the right
- Group the board by status or priority, and hide board columns you do not use (saved per user)
- Create, edit, and delete comments from the detail
- Duplicate, pin, archive, or restore from the detail
…menu (archive offers undo in the toast); delete from the same menu with confirmation
Routes#
| Route | Use |
|---|---|
/projects | List (grid or table) |
/projects/:projectId | Detail (rail + board) |
Board columns#
The Kanban board groups by status or by priority. The Columns menu on the board toolbar hides or shows the columns of the active grouping; at least one column always stays visible.
The selection is per user (not per project) and is saved in
user_preferences.appearance.tasksKanbanHiddenColumns, so it follows you across
projects and devices. Hiding a column only hides it from the board — the tasks in it
still count toward progress and stay in the table and timeline.
Tasks in the detail#
Completed or archived tasks stay visible on the project (Kanban, table, timeline, and progress). Archiving only removes them from the Tasks inbox, not from the project board.
Archiving the project hides it from the active projects list; the detail by URL and related views (e.g. tags) can still see it.
Tips#
- Every task belongs to a project (even a studio default).
- Quantity limits depend on the plan.