Goals defines higher-level objectives and their progress.
What it includes#
- Goal list and detail
- Milestones
- Links to other studio entities
- Cover image (upload or AI generation; same blob flow as activities)
- Vision board — visual collages (images, quotes, notes, and linked goals). Vision-board pins stay on the canvas; they are not geography.
- Quick capture of goals
The list uses a portfolio banner (average progress + goals at risk) and compact cards with a thumbnail. Detail has no hero: the image sits next to the title; the progress block is the control for the active mode; inactive modes are kept and labeled.
Vision board#
The board list shows a collage cover per board (favorite, intention, item and linked-goal counts, archived state). The canvas is a direct-manipulation surface:
- Add creates images, quotes, notes, or a linked goal; the empty canvas offers the same four actions.
- Images can be dropped anywhere on the canvas or pasted from the clipboard — they land where they were dropped. Pasted text becomes a note.
- Pins are dragged to move, resized from the corner handle, and tilted from the handle above the selection (hold Shift to snap to 15°).
- Selecting a pin opens a floating toolbar (edit, details, layer order, duplicate, open goal, remove) that works on touch as well as desktop. Double-click text to edit it in place.
- Keyboard: arrows nudge by one grid step (Shift for five),
Deleteremoves,Cmd/Ctrl+Dduplicates,[/]change layer order,Enteredits,Escdeselects. Focus the corner resize handle and use arrows to change width or height (Shift for five grid steps); its accessible name includes the current dimensions.Presentopens a full-screen view,Escexits. - Linking a goal only offers goals that are not already on the board; archived goals are never offered, and the picker states how many goals the board already holds.
Share#
A goal can be shared without membership (members | followers |
public, default members). Public URL: /@handle/goals/:goalId
(title, description, progress, dates, milestones, image). The URL
follows row visibility even when the studio catalog is private. Linked tasks,
notes, and finance ids stay off the public DTO. A vision board can use the
same share enum. Public URL: /@handle/boards/:boardId. Goal pins on a
public board are filtered to goals the viewer may see.
Insights#
The Insights tab (/goals/insights) summarizes active, at risk, overdue, average progress, breakdown by status/mode, and upcoming goals. API: GET /api/goals/profiles/:studioId/insights-summary?todayDateKey=YYYY-MM-DD.
- Summary cards and status/mode breakdowns are read-only statistics. Upcoming goal rows open the individual goal.
- Portfolio rule: archived goals are excluded from banner KPIs and Insights status/mode breakdowns (same selector as list scope All).
- Upcoming targets: active goals with a target date from today through the next 90 days.
- At risk: active goal, target within 7 days or past due, and progress below 65%.
Routes#
| Route | Use |
|---|---|
/goals | List |
/goals/vision-board | Vision board list |
/goals/vision-board/:boardId | Vision board canvas |
/goals/insights | Insights (risk and progress) |
/goals/:goalId | Detail |
Linked work and AI#
On goal detail, Link related work with AI evaluates up to fifty linkable tasks, activities, and finance savings goals, then adds up to five new links immediately. Optional milestone grouping attaches a link to one milestone for display only; it does not double-count progress. Linked rows can Remove milestone grouping without unlinking the entity. The success toast offers Undo; Undo removes only links and associations created by that operation and still unchanged.
API (OpenAPI tag Goals / AI capabilities): POST …/ai-link-related-work, POST …/ai-effects/:operationId/undo, DELETE …/links/:linkId/milestone.
Tips#
- Progress mode can be manual or other modes depending on the product.
- Attach a cover image (upload or AI) from the list or the detail.
- Export the goals list to CSV from the filter bar.
- Studio goals are unlimited for customers. Private abuse safeguards may return
CAPACITY_GUARD_REACHED. - Vision board: up to 50 boards per studio and 80 items per board. The canvas stores position, size, tilt, and layer order; images go to the private blob.
- Conceptual bridge with Finance savings.
Theme: goals.